msproject07.part2
  • More sharing options
  • Copy file link to clipboard
  • Save file to My Files
Download Diagnostic Tool

The download button will start your download and show a message from our advertisers in a new window.

msproject07.part2.rar
Compressed Archive (.RAR)
  • File size: 95.78MB
  • Uploaded: 2009-08-18 16:13:02

About Compressed Archive Formats

Compressed archives combine multiple files into a single file to make them easier to transport or save on diskspace. Archiving software may also provide options for encryption, file spanning, checksums, self-extraction, and self-installation. Zip is the most-widely used format, used by the Windows operating system and more recently by OSX as well. RAR is also a very popular and flexible format. Unix uses the tar file format, while Linux uses the tar and gz format.

Upgrade to PRO for the best download experience.

  • Bulk download folders
  • Ad-free downloads
  • Direct downloads
Upgrade to Pro
Upload region:

This file was uploaded on August 18, 2009 at 4:13 PM

VirusTotal scan

1/60 engines detected this file. MediaFire scans high-risk files using VirusTotal.

About MediaFire
Welcome!

With MediaFire, you get simple yet powerful file storage along with features you won’t find anywhere else. Learn more

Download application
Default Browser

You are downloading this file with Default Browser.