The download button will start your download and show a message from our advertisers in a new window.
- File size: 91.5KB
- Uploaded: 2021-12-02 01:30:39
About Image Formats
The two main groups of image types are raster and vector. Raster images like JPEG, TIFF, GIF, BMP, and PNG are composed of pixels and can develop a “blocky” quality as the image is made larger because each pixel becomes larger. Vector images, like CGM and SVG, store lines instead of pixels. Using this method image size can be scaled without losing quality. The same vector image will appear correctly on a business card or a billboard.
This file was uploaded from Vietnam on December 2, 2021 at 1:30 AM
MediaFire scans high-risk files using VirusTotal.
You are downloading this file with Default Browser.